Twenty-six contractors are now reporting safety statistics to Build Safe UAE (BSU) against 18 contractors in 2008, according to a senior official. "So far, the reporting for 2009 has been good when compared to the previous year. The industry is already making good progress," said Elias McGrath, Group Administrator, BSU and Assistant Project Manager at Bovis Lend Lease International. "The number of contractors contributing safety statistics has risen from 18 in 2008 to 26 in 2009. Companies are also printing our alerts and posting them up on signboards in the different languages."
BSU is a not-for-profit organisation aimed at improving the health, safety and welfare conditions of all construction industry stakeholders through the free exchange and sharing of information. BSU is now 88-member strong from its initial six in 2008 and the original Build Safe Dubai platform. The list now includes not just the main players in the contracting industry but also developers like Nakheel and Aldar. In March, Dubai Silicon Oasis Authority (DSOA), the regulatory body for DSO, announced that it has become the first government entity from Dubai to join BSU, which has now gone beyond the UAE.
"There is support in Qatar, Kuwait, Saudi Arabia and the surrounding Middle East. They send us photos showing us what they are doing and we have even got feedback from India and many other parts of the globe. Other companies are also sharing information with us and BSU has now become a global tool for the construction industry," said McGrath. "We are also receiving more safety alerts and best practices. Small organisations are following the initiatives of larger companies and sending us their updates the following week."
Above 3,500 industry players subscribe and communicate these safety alerts to their colleagues and on project sites.
The BSU recent alerts documented three fatalities on site. In a recent incident, crew was engaged in trenching and part of the trench collapsed. The two operatives were buried in the soil. While the emergency services managed to take out both the injured workers, one succumbed to his injuries (he was allegedly squatting on the trench). The supervision was found to be incompetent and failed to provide proper shoring for the excavation as well as take into account the previous collapse. BSU recommends that contractors must ensure that all excavations are adequately controlled with a permit to work system (PTW).
It also added that proper shoring/benching/sloping must be compiled as per Dubai Municipality Code of Safety practices on Construction sites. Additionally, it said according to the UAE Labour Law, contractors must remember that when an excavation is 1.5 metre deep, shoring/battering must be placed, safe access must be given and warning signs must be posted. All sites should have a rescue plan when personnel work in excavations. Trench boxes can be effectively used to prevent this type of accident.
In another incident, a worker had headphones attached to a mobile phone and was listening to music. He was walking back from the canteen to his cement bulker vehicle.
The shovel had just been reversed down the ramp of the batching plant where he has been loading aggregate. The shovel operator did not lower the bucket before moving forward and it hit the first worker in the back. Though the latter was given first aid on site, he succumbed to injuries.
Investigative factors showed that the shovel operator had no vision beyond the bucket, there was no banksman to warn the operator and there was no barrier to separate machinery and pedestrians. Besides, though there was a site procedure for the restriction of mobile phones at work, it was ignored.
Once a carpenter walked over a wooden cover placed on the floor. It gave way to his bodyweight and he fell through three more floors (due to uncovered duct shafts) and landed at the podium basement 12 metres down. He succumbed to the fall.
BSU recommends that it is essential to cover all horizontal and vertical openings and to undertake routine inspection to ensure that they are strong enough to withstand heavy loads.
Shaft openings normally encompass majority of floors and hence, all subsequent floor openings should be covered to arrest falls.
On a positive note, Alec recently held its annual emergency evacuation drill at the Mirdif City Center project. 7425 were evacuated with 35 security guards, 92 fire qardens and 17 CRM department staff coordinating the drill. Evacuated personnel were spread between six assembly points with an average evacuation time of 12.5 minutes and roll call of 21.6 minutes.
Meanwhile, Gemaco Interiors stated that it supports BSU and does not allow anyone to enter its sites without being properly inducted on the most specific hazards that are commonly encountered on its projects.
"So far, we have seen reporting becoming more accurate and transparent. Some alerts are from non-BSU members who believe in the concept and are working towards being members of BSU. They are working towards sharing information with their partners in the construction industry," said McGrath.
BSU also has five focus groups. The first one on pre-construction design and management has been completed and the details are up on the website, he said. "It is available to everyone for free guidance," he added. Two others examine labour camp best practice guidelines and best practice guidelines on working on high-rise buildings. The labour camp focus group outcomes will be available next month."
Keep up with the latest business news from the region with the Emirates Business 24|7 daily newsletter. To subscribe to the newsletter, please click here.